Edit settings and recalculate analyses in the web portal
The web portal lets you change an existing project’s assumptions and recalculate its analyses without repeating the site survey.
Open the settings
Section titled “Open the settings”- Open the project from Projects.
- Select the edit settings action.
- Use the internal navigation to browse the sections.
- Change the required fields.
- Click Recalculate and save.
The sections include sizing, orientation, self-consumption with or without a battery, and economic assumptions.
Capacity and orientation
Section titled “Capacity and orientation”Enter the installed capacity, area or module settings using the available modes. Choose the azimuth and tilt for the surface being assessed.
Interpret values derived from a panel layout according to the underlying measurement. A manually entered capacity may differ from the installable capacity calculated from the layout.
Self-consumption and battery
Section titled “Self-consumption and battery”Enter annual consumption and a consumption profile. Depending on your selected options, set the usable battery capacity, sizing method and cost.
Economics
Section titled “Economics”Check the installed cost, electricity purchase and export tariffs, and assessment period. Profitability indicators depend on these assumptions.
Recalculation and synchronization
Section titled “Recalculation and synchronization”If saving is refused or another device has changed the project, see Troubleshoot saving changes in the web portal.
Saving triggers a new calculation. The portal may indicate that a recent mobile change requires you to reload the data. Take this conflict into account before replacing a newer version.
See Project settings on mobile and Economic assumptions.
Projects with several planes
Section titled “Projects with several planes”For multiple planes, choose the plane in the roof-plane section below roof dimensions. Its settings, horizon profile, energy details and layout editor concern that plane. The project’s separate Energy section gives whole-installation production. Adding the first extra plane requires mobile compatibility confirmation; the portal does not capture field surveys.