Frequently asked questions about Azimutis

Do I need to go onto the roof to capture a horizon profile?

Section titled “Do I need to go onto the roof to capture a horizon profile?”

Not necessarily. You can survey from the ground, then use Simulate a different height to estimate solar access at roof level. Check obstacle distances to ensure that the simulation is meaningful. See Simulated height.

Do I need to capture a full 360° horizon?

Section titled “Do I need to capture a full 360° horizon?”

No. Cover the sector relevant to the installation, wide enough to include the sun paths and obstacles that may affect production. In some positions facing a building, this sector is approximately 180°. See Carry out a reliable survey.

Yes. The horizon profile chart lets you review and edit the profile data. See Edit the horizon profile.

Can I assess the effect of removing a tree?

Section titled “Can I assess the effect of removing a tree?”

You can adjust a theoretical horizon profile in Scenario mode and compare its results with the original project. This is a simulation, not a new measurement. See Test a scenario.

Can I use Complete the site survey later if the site has no shading?

Section titled “Can I use Complete the site survey later if the site has no shading?”

Yes. This lets you continue without a survey when the site has no shading. It also lets you prepare a project before a visit; in that case, any obstacles will need to be surveyed later. Other system losses are still included. See Assess a project without a survey.

What is the difference between self-consumption and self-sufficiency?

Section titled “What is the difference between self-consumption and self-sufficiency?”

Self-consumption compares PV energy used on site with production. Self-sufficiency compares PV energy used with the site’s consumption. See Understand self-consumption.

Is the suggested battery capacity the most profitable?

Section titled “Is the suggested battery capacity the most profitable?”

Not necessarily. Automatic sizing seeks an energy-based compromise; cost and profitability must be assessed separately. See Configure the battery.

On the project page in the web portal, select Hourly data → Configure. See Hourly export.

Check that you are signed in to the same account, that the network is available and that synchronization has completed. See Connection and synchronization.

From the results, select PDF report, choose the sections, then view and share the document. See Prepare a PDF.